Press conference on "Aligning of the NSI information assets in accordance with Eurostat requirements and migration to Hybrid Private Cloud" project
The project duration is 18 months (September 2016 - February 2018) and amounts to 1 566 401.43 BGN.
The project duration is 18 months (September 2016 - February 2018) and amounts to 1 566 401.43 BGN.
The main objective of the project is aligning of the NSI information assets in accordance with the ISO / IEC 27001: 2013 "Information Security Management System” by providing server infrastructure, storage infrastructure, software for creation and management of backups and network components.
The duration of the project is 18 months (March 2017 - September 2018) and its total amount is 594 100 BGN.
The action aims to improve quality of the information on the largest multinational groups and their constituent statistical units in the national statistical business register (SBR) and in the EuroGroups Register (EGR).
The main project aim is preparation of the implementation of new PRODCOM (statistics on production of industrial goods) data requirements in the Frame Regulation for Integrated Business Statistics (FRIBS), namely for collection, processing and transmission to Eurostat of data on the Production manufactured on sub-contracting basis.